Scroll down

Health & Safety

Health & Safety

It is our aim to share information and improve the communication between all departments within Lusail.

TypeDrawer/FileDate ModifiedSize

pdf
LUS HSE WG3-446-004 03 Incident Reporting & Investigation 9:52 pm 11/02/2022237.6k

pdf
LUS HSE WG3-446-005 02 Field and Office Facillities 9:52 pm 11/02/2022324.7k

pdf
LUS HSE WG3-446-006 01 Personal Protective Equipment (PPE) 9:52 pm 11/02/2022627.1k

pdf
LUS HSE WG3-446-010 01 Control of Substances Hazardous to Health 9:52 pm 11/02/2022300k

pdf
LUS HSE WG3-446-011 01 Emergency Planning & Response 9:52 pm 11/02/2022325.2k

pdf
LUS HSE WG3-446-013 01 Construction Hazardous Waste Management & Operations 9:52 pm 11/02/2022220.7k

pdf
LUS HSE WG3-446-014 01 Concrete & Masonry Construction 9:52 pm 11/02/2022287.5k

pdf
LUS HSE WG3-446-015 01 Confined Space Entry 9:52 pm 11/02/2022300.3k

pdf
LUS HSE WG3-446-016 01 Sign, Barricades, and Traffic Control 9:52 pm 11/02/2022268.6k

pdf
LUS HSE WG3-446-017 01 Hazardous Materials Handling, Transportation & Storage 9:52 pm 11/02/2022297k

pdf
LUS HSE WG3-446-018 01 Walking and Working Surfaces 9:52 pm 11/02/2022277.3k

pdf
LUS HSE WG3-446-019 01 Ladders 9:52 pm 11/02/2022278.5k

pdf
LUS HSE WG3-446-020 01 Scaffolds 9:52 pm 11/02/2022318.2k

pdf
LUS HSE WG3-446-021 01 Aerial Lifts 9:52 pm 11/02/2022267.2k

pdf
LUS HSE WG3-446-022 01 Fall Protection 9:52 pm 11/02/2022328.2k

pdf
LUS HSE WG3-446-023 01 LackoutTagout (LOTO) 9:52 pm 11/02/2022293.9k

pdf
LUS HSE WG3-446-024 01 Electrical Safety 9:52 pm 11/02/2022338.5k

pdf
LUS HSE WG3-446-025 01 Motor Vehicles and Heavy Equipments 9:52 pm 11/02/2022293.8k

pdf
LUS HSE WG3-446-026 01 Cranes,Hoist, and Lifts 9:52 pm 11/02/2022304.5k

pdf
LUS HSE WG3-446-027 01 Pressurized Systems 9:52 pm 11/02/2022280.7k

pdf
LUS HSE WG3-446-028 01 Welding, Cutting, and Brazing 9:52 pm 11/02/2022281.5k

pdf
LUS HSE WG3-446-029 01 Tools 9:52 pm 11/02/2022338.2k

pdf
LUS HSE WG3-446-030 01 Underground Construction 9:52 pm 11/02/2022318.5k

pdf
LUS HSE WG3-446-031 01 Blasting 9:52 pm 11/02/2022319.4k

pdf
LUS HSE WG3-446-032 01 Demolition 9:52 pm 11/02/2022279.2k

pdf
LUS HSE WG3-446-033 01 Excavations 9:52 pm 11/02/2022318.7k

pdf
LUS HSE WG3-446-034 01 Steel Erection 9:52 pm 11/02/2022274.4k

pdf
LUS HSE WG3-446-035 01 Toxic & Hazardous Substances 9:52 pm 11/02/2022289.9k

pdf
LUS HSE WG3-446-041 01 Suspended Man Baskets 9:52 pm 11/02/2022305.1k

pdf
LUS HSE WG3-446-042 01 Permit to Work Program 9:52 pm 11/02/2022280.8k

pdf
LUS HSE WG3-446-043 01 Recordkeeping & Reporting 9:52 pm 11/02/2022279.3k

pdf
LUS HSE WG3-446-044 02 Risk Assessments 9:52 pm 11/02/2022350.2k

pdf
LUS HSE WG3-446-045 01 Method Statements 9:52 pm 11/02/2022241.2k

pdf
LUS HSE WG3-446-046 01 Training 9:52 pm 11/02/2022238.9k

pdf
LUS HSE WG3-446-047 01 Construction Site Security Procedure 9:52 pm 11/02/2022264.1k

pdf
LUS HSE WG3-446-048 01 Project Site Inspection and Auditing 9:52 pm 11/02/2022284.7k

pdf
LUS HSE WG3-446-049 01 Standard HSE Meetings 9:52 pm 11/02/2022244.9k

pdf
LUS HSE WG3-446-051 01 Contractor HASP & HSE Staffing Requirements 9:52 pm 11/02/2022265.2k

pdf
LUS HSE WG3-446-052 05 Failure to Comply with Lusail Policy Procedure 9:52 pm 11/02/2022287.5k

pdf
LUS HSE WG3-446-053 01 Workplace Violence and Bullying Prevention 9:52 pm 11/02/2022265.2k

pdf
LUS HSE WG3-446-061 00 Buidling Plan Fire Safety Guide 9:52 pm 11/02/2022425.5k

pdf
LUS HSE WG3-446-065 00 Minimum Requirements for Event Planning 9:52 pm 11/02/202297.1k

pdf
LUS HSE WG3-446-066 00 PEEPO 9:52 pm 11/02/2022197.2k
© COPYRIGHT 2024 / LUSAIL REAL ESTATE DEVELOPMENT COMPANY W.L.L. | Privacy Policy
Back to top